FMB Member Assessment Report
Details of member to be assessed - FMB: 14859
REF NO:
Existing Member ✔ Pre Approval Member
Work in Progress Completed 3 Year Report ✔


Work/project inspected  13, Brynrhedyn, Coedycwm, 
Assessment summary


Satisfactory ✔ Unsatisfactory (tick as appropriate)
(Please state reasons and/or areas for improvement if unsatisfactory)
Approvals/Authorisations seen
N/A

D Monaghan 05/12/2018
Inspector’s name: Date of inspection:

Digitally signed by D Monaghan 
Date: 2018.10.12 14:52:49 +01'00' 

Assessment Report

Use this sheet to record observations or as a checklist. The aim of the assessment is to form an opinion of the overall quality of the work.
Evergray Ltd External works &

Member name: EVERGRAY LTD

Project: External Works and Refurbishment

A= Acceptable, NA=Not acceptable,
NR=Not Relevant, Un=Unable to confirm/inspect A
 NA
 NR
 Un

Foundations
Foundations in place and constructed to comply with the Building Regulations and/or relevant British Standards.

All obstructions removed ✔
Any presence of contaminants in ground ✔
Depth/width appropriate for all load bearing walls. ✔
Basements
Ensure that all tanking is correctly installed and linked into the DPC and DPM of the above ground structure.


Substructure
Construction of floor/sub-floor suitable for the site conditions ✔
Service entries filled ✔
All DPC’s linked to suitable DPM’s ✔
Is there adequate support to internal partitions ✔
Superstructure
Masonry appearance satisfactory overall including line and level ✔
Weep holes provided where necessary ✔
Vertical and horizontal DPCs positioned correctly ✔
Adequate support provided above structural openings ✔
Windows and Doors properly fitted and with ventilation provision ✔
Upper floor construction satisfactory including any drilling and notching ✔
Internal walls adequately supported ✔
Provision of lateral restraint straps adequate ✔
Restraint Straps and noggins in place ✔
DPCs in place to all openings ✔
Adequate support to internal partitions ✔
Cavities free of debris ✔
Cavity insulation correctly positioned and clear of mortar droppings ✔
Roof
Roof members been adequately constructed and to the correct centres ✔
Sufficient provision for diagonal & lateral bracing, tank supports etc ✔
Restraint straps and noggins in place and correctly fitted ✔
Sufficient provision for roof void ventilation ✔
Roof coverings correct for the roof pitch including fixings, lap, battens and felt ✔
Flashings, soakers and up stands correctly fixed ✔
Flat roof falls adequate ✔
Rainwater goods adequate ✔
Fascias, soffits and bargeboards properly fixed ✔
Cavity barriers provided where appropriate ✔
Ensure that the batten sizes, spacing and fixings are compatible with the covering and each other ✔
Is there sufficient thermal insulation and has this been correctly installed


Services
Overflows correctly and safely positioned including condensate pipes and blow off pipes to unvented hot water systems


Flue terminals correctly positioned/guarded ✔
Meter boxes properly secured and gas pipes properly earthed ✔
Boilers installed to manufacturers instructions ✔
Space heating functioning properly and adequate controls evident ✔

Copies of electrical and gas certificates provided to owner ✔
Mechanical ventilation and smoke detectors functioning properly ✔
Local Authority Building Control notifications seen and approvals/ authorisations sought/seen ✔
Ground Works & Below Ground Drainage
Correct line and falls to below ground drains ✔
Above ground drainage adequate ✔
Adequate rodding/jetting facilities present ✔
Paths, ramps and drives laid to self draining falls with adequate provision for the disabled ✔
Finishes
Internal and external paintwork satisfactory ✔
Sealants applied correctly both internally and externally ✔
Socket outlets and switches correctly fixed ✔
Kitchen and bathroom fittings satisfactory ✔
Ceiling and wall finishes smooth and flat ✔
Floor finishes neatly fixed and finished ✔
Ground and upper floor finishes smooth and level ✔
Other works, inc Landscaping, Drives etc Please list ✔

Comments

Satisfied with progress and quality: YES


Comments: Please insert relevant details to support final decision:


The contractor was not present at the time of the assessment, I was informed which works had been completed by a gentleman carrying out painting and decorating duties. The project is almost at completion stage.
Project consists of external works and internal refurbishment. Externally a retaining wall has been built at the boundary with adjourning property where ground level is considerably lower than the project address using facing bricks and finished to a good standard.
Various internal works have also been completed including a new fully fitted kitchen and utility room, cupboards, worktops, sink unit & cooker etc. Walls and ceilings have all been re-plastered and decorated & tiled where required. New tile flooring has also been installed throughout. A separate WC has been refurbished consisting of new toilet, wash basin, re-plastered and painted walls & new tile flooring. All works that have been assessed are completed to a good standard.
The client Mr Wilson arrived home midway through the assessment and is happy with work done so far. He employed the contractor for this project as he has carried out work for him previously.
A small works contract was signed by both parties before works began.


Photographs attached:  NO ✔
05/12/2018
Date:
Reset Submit

1. This Report:
– relates only to the product/system and the location installation identified herein;
– has to be read, considered and used in its entirety and as a whole document – it may be misleading and will be incomplete to be selective;
– is based on a visual inspection only of those elements of the installation which are specifically described in the Report
– is copyright of the BBA.

2. Publications and documents referred to in this Report are those that were current at the date this Report was issued, except where stated otherwise.
3. The BBA has used due skill, care and diligence in the preparation of this Report, but no warranty is provided.
4. The BBA is not responsible and is excluded from any liability for the design, materials, workmanship, installation and performance of the product/system and any loss or damage, including personal injury, howsoever caused by the product/system, including its manufacture, supply, installation, use, maintenance and removal.
5. This Report does not constitute an approval, certification or endorsement of the product/system or its installation.

Click Terms at Bottom of Pages for details of Small Works Contracts and Current Employers Liability Insurance

2 New Vehicles added to fleet in July 2014

March 2014  Staff Completed Training on External Wall Insulation

 

6th February 2012

Registered with Enviroment Agency to become a " Registered Waste Carrier ( RWC ) "

This ensures our committment to the enviroment and recycling waste. This also ensures our Clients can be confident that any waste generated from works at their property is disposed of efficiently and correctly

20th January 2012

After receiving a "HIGHLY COMMENDED" award ( See previous page "About us") at the recent RCTCBC Quality Awards 2012 we have also teamed up with the Local Authority in the LABC Partner Authority Scheme whereby we can access all the Professional Support in works required for your project, extracts of the benefits of which are shown below 

18th January 2011

National Register of Warranted Builders Quality Inspection Pass Certificate received after inspecting work we recently completed.

This a scheme carried out by the NRWB as part of its continued efforts to raise standards in the Construction Industry

OCTOBER 2010

Hi Rob

Due to the high standard of work produced at the above address, I will be entering the building for the 2011 Building Control Quality Awards under the category Extension/Alterations. I have approached the owner of 1 Caerau Court, Cross Inn and she has given her permission to photograph and document the property once its painted. For any further information regarding the Awards, please contact myself on the number below.

Kind Regards
Conrad Bowtell
Building Control Officer
Rhondda Cynon Taff CBC
Sardis House, Pontypridd. 01443 494753

APRIL 2009

Congratulations to Steve Chown and New employee Nigel Smith on receiving more Certificates from the Townscape Heritage Initiatives a CADW approved project for INTRODUCTION TO LIME on Conservation Projects. Further proof of our committment to upskilling of staff.

JANUARY 2009

Once again Congratulations to employees Steve Chown and Steve Parsons on receiving Cetificates from the Townscape Heritage Initiatives a CADW approved project for LEADWORK on Conservation projects. This continues our Company's committment to upskilling our staff

DECEMBER 2008

Constructionline Approved for 8th consecutive year.

NOVEMBER 2008

 As a member of the FMB and qualified to use the MASTERBOND Scheme and Approved to promote the Government backed TRUSTMARK Scheme we are pleased to offer potential future Customers / Clients the opportunity to protect your investment / Works by obtaining a WARRANTY to give additional assurance. On Offer is TWO entry levels MasterBond 2 and MasterBond 6

MASTERBOND 2

at 1% of the Contract Price ( Min Premium £75 ) will provide protection against the following:

A) Loss of deposit and / or liquidation during construction up to 10% of the insured value of works

B) SIX months protection against physical damage or major physical damage resulting in your builder failing to comply with regulations or Codes of practice or matters which create a danger to the health and safety of the occupants as defined by the policy.

C) EIGHTEEN months protection against major physical damage or matters which create a danger to the health and safety of the occupants as defined by the policy.

D) Protection from events occurring as a result of any failure to deal effectively with any contaminated land within the footprint of the building.

MASTERBOND 6

at 1.65% of the Contract Price (Min Premium £150.00)

A) Loss of deposit and / or liquidation during construction up to 10% of the insured value of the works

B) TWO years protection against physical damage or major physical damage resulting in you builder failing to comply with regulations or Codes of Practice or matters which create a danger to the health and safety of the occupants as defined by the policy

C) FOUR YEARS protection against major physical damage or matters which create a danger to the health and safety of the occupants as defined by the policy.

D) Protection from events occurring as a result of any failure to deal effectively with any contaminated land within the footprint of the building

For further information or a Leaflet on the scheme please
contact us
.

October 2008

Congratulations to our Employees Steve Chown and Steve Parsons on achieving their Certificate from the Townscape Heritage Initiatives in the County of Bridgend for STONE repairs in the Conservation area of works. This upskills the workforce to qualify them to undergo any future projects required under the Initiatives Schemes.



20th DECEMBER 2007

Constructionline approved for 7th Consecutive Year

Watch progress of works updated regulary during construction

20th DECEMBER 2006

Constructionline approved for 6th consecutive year

4th JANUARY 2006

Signed Licence TRUSTMARK a new Government Endorsed Standard Scheme for the Building Industry

20th DECEMBER 2005

Constructionline approved for 5th consecutive year.

19th DECEMBER 2005

Awarded contract for works at Aberdare School